As part of the San Diego Unified Port District embarcadero renovation the harbor tour boats needed to be relocated to an area between Navy and Broadway piers. PTS in conjunction with Bellingham Marine installed an engineered vessel dock system that called for the driving of 24 inch Marina pile. PTS provided the manpower and equipment to install the system on time and under budget.