Hornblower Dock System
Hornblower Cruises was relocated to various locations along the embarcadero as part of the Port renovation program. In addition to the docking area created by the PTS / Bellingham team between Broadway and Navy pier 2 specialty mooring locations were created that required 20inch pipe pile to be driven using PTS’s Crane barge DB SAN Diego.