This project consisted of the removal of large pier sections that were destroyed in a storm, then the design, construct and install replacement pier
sections. The work included heavy lift crane service with extensive lift calculations. The design and installation required
detail planning to match existing onsite conditions. This type of work added to our overall capability of planning,
engineering and production on complex projects. All work was successfully completed with zero incidents.